Cement Division ► Environmental Protection & Go Green Activities  
 
Profile
Milestones
Awards & Recognition
Photo Gallery
Infrastructure
Research & Development
Quality Policy & EHS Policy
Environmental Protection
Product Portfolio
Marketing Network
Request for Quote
FAQs
Customer Service & Support
Enquiry/ Feedback
Contact us
 
 

Environmental Protection & Go Green Activities
The Company has adopted 'Zero' discharge Concept.

 
1
List of environmental safeguard activities taken in and around the surrounding
       Covered Shade for Raw Materials & Coal Storage
Control of Stack emission
Control Fugitive dust emission
Control of SO2 and NOx gas emission
Control of noise level
Management and solid & Hazardous waste
   
   
2 Initiative to conserve natural resources
     Covered Conveyor Belt
Utilization of minimum quantity of clinker in PSC by maximizing slag consumption.
Use of flyash from Sponge Iron plant as raw material
Use of cinder from refractory plant as raw material
Reduction in power consumption through various techniques
Installation of rain water harvesting systems in the plant & colony
Recycling of ETP treated water for machinery cooling and dust suppression.
3 Initiative towards water conservation
  The Company has adopted ‘zero’ discharge concept. Waste water generated in the plant is treated in the Effluent Treatment Plant (ETP) and used for process and cooling purposes as make up water in the existing Cement plant. The quality of effluent water after treatment is being analyzed and reported to the required authorities.
4 Initiatives towards reduction of Green House Gases
  Company has adopted various measures to maximize the replacement of clinker by slag without compromising quality to produce Portland Slag Cement thereby reducing the emission of green house gases. The company is also registered for Carbon credit under CDM (Clean Development Mechanism) Project.
5 New initiatives to reduce GHG
    Road Sweeping Machine
Vehicle free day observed on every Saturday of the week in the factory
Arresting false air leakages in process circuits to save fuel & power
Insulation of hot air ducts to maintain maximum heat in process circuit for fuel & power reduction
Installation of VFD drive to reduce power consumption
   
6 New initiatives towards Environment
    Effluent Treatment Plant (ETP)
Certification of Environment , Occupational Health and safety Management System as per IS/ISO 14001:2004 & IS 18001:2007 by Bureau of Indian Standards
Installation of Clinker silo for clinker storage.
Covered shed for raw materials with Stacker & Reclaimer working inside.
Covered conveyor belts for raw materials transportation.
Installation of dry fog system.
Installations of Bag house in Kiln & VRM.
Installation of on- line Continuous particulate monitoring system in main stacks.
Using flyash bricks in the construction of new project.
Deployment of Vacuum Suction Road Sweeping Machine to control fugitive dust on the roads of plants and Colony.
Celebration of ‘World Environment Day’ on 5th June by organizing various competitions and massive plantations to create awareness among the people of villages, employees, colony ladies & children
Concreting the Municipality road just outside the factory to reduce fugitive dust.
Installation of Weather monitoring system.
Installation of STP to treat OCL Colony & part of Rajgangpur town sewerage for recovery and reuse of water.
Water audit for entire plant & colony by external agency
 
7  DOWNLOAD ENVIRONMENTAL DOCUMENTS  
    2016-2017
  Six Monthly EC Compliance HYE Sept 2016 Mines View File
  Six Monthly Envi Monitoring Report HYE Sept 2016 Mines View File
 
    2015-2016
  SIX MONTHLY EC COMPLIANCE LQ MINES MAR-2016 View File
  Six Monthly Report Of EC To SEIAA(APR15-SEP15) View File
  FORM -V 2015-16 CEMENT PLANT View File
  Six Monthly Compliance Report Sept 2015 View File
  Six Monthly EC Compliance Report (APR-16 to SEPT-16) CPP View File
  Six Monthly Envi Monitoring Report Sept 2015 View File
  Six Monthly EC Compliance Report (APR-16 to SEPT-16) Line 1 View File
  SIX MONTHLY ENVIRONMENTAL REPORT LQ MINES MAR-2016 View File
  Six Monthly Report Of EC-LINE1(APR15-SEP15) View File
  Six Monthly EC Compliance Report (APR-16 to SEPT-16) Line 2 View File
  LQ ANNUAL RETURN FORM V 2015-16 View File
  Six Monthly Report Of EC-LINE2(APR15-SEP15) View File
 
    2014-2015
  17th Six Monthly-OCT14 TO MAR15-LQ View File
  16th Six Monthly-APR14 TO SEP14-LINE2 View File
  17th Six Monthly-OCT14 TO MAR15-CPP View File
  16th Six Monthly-APR14 TO SEP14-CPP View File
  Six Monthly Report of EC Compliance(OCT14-MAR15) View File
  Six Monthly Report of EC Compliance(APR14-SEP14) View File
  Form V 2014-15 View File
  17th Six Monthly-OCT14 TO MAR15-LINE1 View File
  16th Six Monthly-APR14 TO SEP14-LINE1 View File
  17th Six Monthly-OCT14 TO MAR15-LINE2 View File
  16th Six Monthly-APR14 TO SEP14-LQ MINES View File
 
    2013-2014
  Six monthly report of EC to SEIAA- (OCT-13 to MAR-14) View File
  15TH SIX MONTHLY (OCT-13 TO MAR-14) LINE-1 View File
  15TH SIX MONTHLY (OCT-13 TO MAR-14) LINE-2 View File
 
    2012-2013
  14TH SIX MONTHLY (APRIL-13 TO SEPT-13) LINE-1 View File
  Forest Clearance Condition-Stage 1 View File
  Forest Clearance Condition-Stage 2 View File
  Forest Clearance 10001 View File
  Six monthly report of EC to SEIAA- (April-13 to Sept-13) View File
  14th six monthly-(April-13 to Sept-13)-Line2 View File
 
    2011-2012
  AMBIENT AIR QUALITY & STACK EMISSION DATA-HALF-YEAR ENDED View File
  AMBIENT AIR QUALITY & STACK EMISSION DATA-YEAR ENDED ON MARCH View File
 
    2010-2011
  STACK EMISSION DATA-YEAR ENDED ON MARCH View File
  EC MINES 4.2 MT 2010 View File
(C) OCL India Ltd.
Powered by Hi Technology & Services SEO Company India