Environmental Protection & Go Green Activities
The Company has adopted 'Zero' discharge Concept.
|
| |
|
| 2 |
Initiative to conserve natural resources |
 |
| Covered Conveyor Belt |
|
 |
Utilization of minimum quantity of clinker in PSC by maximizing slag consumption. |
 |
Use of flyash from Sponge Iron plant as raw material |
 |
Use of cinder from refractory plant as raw material |
 |
Reduction in power consumption through various techniques |
 |
Installation of rain water harvesting systems in the plant & colony |
 |
Recycling of ETP treated water for machinery cooling and dust suppression. |
|
 |
| 3 |
Initiative towards water conservation |
| |
The Company has adopted ‘zero’ discharge concept. Waste water generated in the plant is treated in the Effluent Treatment Plant (ETP) and used for process and cooling purposes as make up water in the existing Cement plant. The quality of effluent water after treatment is being analyzed and reported to the required authorities. |
|
 |
| 4 |
Initiatives towards reduction of Green House Gases |
| |
Company has adopted various measures to maximize the replacement of clinker by slag without compromising quality to produce Portland Slag Cement thereby reducing the
emission of green house gases. The company is also registered for Carbon credit under CDM (Clean Development Mechanism) Project. |
|
 |
| 5 |
New initiatives to reduce GHG |
 |
| Road Sweeping Machine |
|
 |
Vehicle free day observed on every Saturday of the week in the factory |
 |
Arresting false air leakages in process circuits to save fuel & power |
 |
Insulation of hot air ducts to maintain maximum heat in process circuit for fuel & power reduction |
 |
Installation of VFD drive to reduce power consumption |
| |
|
 |
|
| 6 |
New initiatives towards Environment |
 |
| Effluent Treatment Plant (ETP) |
|
 |
Certification of Environment , Occupational Health and safety Management System as per IS/ISO 14001:2004 & IS 18001:2007 by Bureau of Indian Standards |
 |
Installation of Clinker silo for clinker storage. |
 |
Covered shed for raw materials with Stacker & Reclaimer working inside. |
 |
Covered conveyor belts for raw materials transportation. |
 |
Installation of dry fog system. |
 |
Installations of Bag house in Kiln & VRM. |
 |
Installation of on- line Continuous particulate monitoring system in main stacks. |
 |
Using flyash bricks in the construction of new project. |
 |
Deployment of Vacuum Suction Road Sweeping Machine to control fugitive dust on the roads of plants and Colony. |
 |
Celebration of ‘World Environment Day’ on 5th June by organizing various competitions and massive plantations to create awareness among the people of villages, employees, colony ladies & children |
 |
Concreting the Municipality road just outside the factory to reduce fugitive dust. |
 |
Installation of Weather monitoring system. |
 |
Installation of STP to treat OCL Colony & part of Rajgangpur town sewerage for recovery and reuse of water. |
 |
Water audit for entire plant & colony by external agency |
|
 |
|
|